Islamabad: The 969 MW Neelum-Jehlum hydropower project, which is non-operational since July 6, 2022 in the wake of blockage that appeared in the 3.5 kms Tail Race Tunnel (TRT), has seen an estimated damage of Rs22.50 billion (Rs...
Register or Login to take full benefit of the PMM System